Posted on February 10th, 2015 by heatherwestpr
Linetec’s Andy Joswiak says it was then decided to bring the AAMA AFPA reference document out of retirement and update it to include the important information removed from AAMA CW-10.
Filed under: AAMA, ASSOCIATION NEWS, Linetec, Products | Comments Off on Association News: AAMA releases anodic finishes/painted aluminum document
Posted on February 9th, 2015 by heatherwestpr
Wausau’s 3250i INvent Retro™ XLT Series windows simulate the look of original, turn-of-the-century steel windows’ true divided lites with a narrow, exterior face in cove profiles.
Filed under: AAMA, Buildings + Infrastructure, CLIENT NEWS, Linetec, Projects, Wausau Window and Wall Systems | Comments Off on Client News: Soho House Chicago achieves historic aesthetic with modern, high-performance window renovation
Posted on February 2nd, 2015 by heatherwestpr
More than 1,200 bays of existing single-pane windows were replaced with Wausau Window and Wall Systems’ energy-efficient units.
Filed under: AAMA, Buildings + Infrastructure, CLIENT NEWS, Linetec, Projects, Wausau Window and Wall Systems | Comments Off on Client News: Prudential Tower I in Chicago replaces windows for updated aesthetics, tenant comfort, energy-efficiency
Posted on January 5th, 2015 by heatherwestpr
“The entrances, curtainwall and sun shades magnify the scale and sweep of the design viewed from the exterior. Grand views and lots of daylight bring a warmth and sense of place to the interior.”
Filed under: Buildings + Infrastructure, CLIENT NEWS, Green Goals, Linetec, Projects, Tubelite Inc. | Comments Off on Client News: Mansfield Center for Performing Arts commands an audience with Tubelite’s distinctive products
Posted on December 18th, 2014 by heatherwestpr
Opened in January 2014, the new Michael Graves School of Architecture and Robert Busch School of Design are housed within the Green Lane Academic Building, as well as the university’s expanding business program.
Filed under: AAMA, AIA, Buildings + Infrastructure, Green Goals, Linetec, Products, Projects, USGBC | Comments Off on Linetec finishes curtainwall, sun shades, skylight, entrances on Kean University-Green Lane Academic Building
Posted on November 12th, 2014 by heatherwestpr
Linetec finished the aluminum-framed curtainwall, windows, sliding door and skylight systems in its Pure White color. Using Valspar’s Fluropon®, Linetec matched and blended the 70 percent polyvinylidene fluoride (PVDF) coating in-house to provide a consistent appearance across multiple products and manufacturers.
Filed under: AAMA, AIA, Buildings + Infrastructure, CLIENT NEWS, Harmon, Inc., Linetec, Projects, Valspar, Wausau Window and Wall Systems | Comments Off on Client News: Linetec and Valspar provide consistent, durable finish for Aspen Art Museum’s white exterior composed of multiple architectural metal products
Posted on November 11th, 2014 by heatherwestpr
Wausau is exhibiting at AIA Minnesota expo booth #106
Filed under: AAMA, Buildings + Infrastructure, CLIENT NEWS, Green Goals, Linetec, Projects, Tradeshow Thoughts, Wausau Window and Wall Systems | Comments Off on Client News: Wausau connects new University of Minnesota Recreation and Wellness Center to greater campus
Posted on October 14th, 2014 by heatherwestpr
MCA honors the iridescent, metal-clad Institutional Project with the 2014 Chairman’s Award
Filed under: Buildings + Infrastructure, CLIENT NEWS, Events, Linetec, Products, Projects, Valspar | Comments Off on Client News: Metal Construction Association recognizes Valspar’s color-changing Kameleon coatings on award-winning Exploration Tower at Port Canaveral
Posted on September 11th, 2014 by heatherwestpr
The center seeks LEED® Silver certification from the U.S. Green Building Council, a standard that all new USU projects within the last seven years has earned.
Filed under: Buildings + Infrastructure, CLIENT NEWS, Green Goals, Linetec, Projects, Tubelite Inc., USGBC | Comments Off on Client News: Utah State University’s Wayne Estes Center attracts student athletes with Tubelite curtainwall’s daylight and views
Posted on September 10th, 2014 by heatherwestpr
The 120,000-square-foot addition and associated improvements are estimated to cost $15.3 million and to bring nearly 100 jobs to the city of Wausau, Wisconsin.
Filed under: Buildings + Infrastructure, CLIENT NEWS, Linetec | Comments Off on Client News: Linetec to expand with a third anodize line in Wisconsin adding jobs, capacity, capabilities; maintaining lead times