Posted on October 29th, 2014 by heatherwestpr
As part of creating comfortable, healthy spaces that respect the environment, minimizing repair and maximizing longevity are key considerations in any sustainably designed project.
Filed under: Buildings + Infrastructure, CLIENT NEWS, CSI, Green Goals, Projects, ROCKFON, Tradeshow Thoughts, USGBC | Comments Off on Client News: ROCKFON helps Metro Toronto Convention Centre meet aesthetic, sustainable durability goals
Posted on September 11th, 2014 by heatherwestpr
The center seeks LEED® Silver certification from the U.S. Green Building Council, a standard that all new USU projects within the last seven years has earned.
Filed under: Buildings + Infrastructure, CLIENT NEWS, Green Goals, Linetec, Projects, Tubelite Inc., USGBC | Comments Off on Client News: Utah State University’s Wayne Estes Center attracts student athletes with Tubelite curtainwall’s daylight and views
Posted on September 9th, 2014 by heatherwestpr
The $76 million, 18-story mixed-use building opened Feb. 15, 2014, and is pursing Silver certification through the U.S. Green Building Council’s LEED® rating system.
Filed under: AAMA, CLIENT NEWS, Linetec, Tubelite Inc., USGBC, Wausau Window and Wall Systems | Comments Off on Client News: Idaho’s tallest building showcases Wausau’s unitized curtainwall, a first in the state
Posted on September 8th, 2014 by heatherwestpr
“Innovative and aesthetically pleasing, these frameless acoustic islands provide an alternative acoustic solution for rooms where suspended ceilings are not suitable. They can be used as part of a retrofit or to create a cloud-like design feature.”
Filed under: Products, ROCKFON, USGBC | Comments Off on Client News: Rockfon Island’s frameless ceiling products deliver acoustical performance, easy installation
Posted on July 29th, 2014 by heatherwestpr
Manufactured and installed by Super Sky Products Enterprises, LLC, this multi-slope, dome skylight with cupola and finial spans nearly 39 feet in diameter. This signature glass structure is framed in aluminum, finished by Linetec in Valspar’s durable Fluropon® Classic II bronze finish.
Filed under: AAMA, Buildings + Infrastructure, CLIENT NEWS, Green Goals, Linetec, Projects, USGBC, Valspar | Comments Off on Client News: Skylight finished by Linetec crowns The Alfond Inn at Rollins, Florida
Posted on July 1st, 2014 by heatherwestpr
A custom Oyster Metallic finish was selected for the ceiling baffles in the concession area. “We did not have much ceiling space to play with. The linear baffle ceiling hides the structure above and makes it feel like a higher ceiling.”
Filed under: AIA, Chicago Metallic, CLIENT NEWS, ROCKFON, USGBC | Comments Off on Client News: OHare International Airport Terminal 5 renovates with ROCKFON ceiling systems for Modern look, easy maintenance
Posted on June 30th, 2014 by heatherwestpr
Further supporting academic and community interests, the school’s addition is pursuing LEED® certification
Filed under: AIA, Buildings + Infrastructure, CLIENT NEWS, Events, Green Goals, Kodet Architectural Group, Projects, USGBC | Comments Off on Client News: Kodet Architectural Group wins AIA Minneapolis 2014 Merit Award for Hmong College Prep Academy
Posted on June 18th, 2014 by heatherwestpr
Chris Marshall serves as ROCKFON’s director of architectural sales for North America and manages a team of architectural sales managers, including Dan Aiken, Isabelle Champagne, Philip Curran, Suzanne Dissette and Diana Hart./wp-content/uploads/2014/06/5ROCKFON_DanielAiken-215×300.jpg
Filed under: AIA, Chicago Metallic, CLIENT NEWS, CSI, ROCKFON, USGBC | Comments Off on Client News: ROCKFON’s architectural sales team attends AIA Expo
Posted on June 6th, 2014 by heatherwestpr
While HPDs focus on raw materials in a product, PTDs focus on a finished product delivered to a job site.
Filed under: AAMA, ASSOCIATION NEWS, Events, Green Goals, Products, USGBC | Comments Off on Association News: Freeman addresses product transparency declarations during the AAMA Summer Conference
Posted on May 12th, 2014 by heatherwestpr
“We are proud to celebrate the many partnerships that led to Target Field Station’s success. From concept through completion, our team managed more than 120 on-site contractors to complete the project on time and on budget.”
Filed under: Buildings + Infrastructure, CLIENT NEWS, Events, Green Goals, Knutson Construction, USGBC | Comments Off on Client News: Knutson celebrates grand opening of Target Field Station